- Products Details
Quick Details
-
Brand Name: Hengtao
Model Number: Customization
Place of Origin: China
Packaging & Delivery
- Packaging Details: Standard Seaworthy Package
- Delivery Detail: Shipped in 30 days after payment
Specifications
Specifications
Water wall panels
Boiler water wall panels are membrane water walls that are made of tubes welded together with or without a strip of metal in between. These membrane water walls form the enclosure of the coal combustion chamber. Water wall tubes are also referred to as the evaporator section; they contain water mostly in liquid form which gradually evaporates as it rises in the boiler.
Product Name |
Boiler Water Wall Panels |
Material |
Steel Tubes |
Tube Size |
φ 51-60 mm boiler tubes |
Standard |
ISO 9001; ISO 14000; |
Series |
20 GB 3087;20 GB 5310 |
Brand |
HTEG |
Equipment |
Automatic production equipment |
Application |
Coal boiler combustion chamber |
Products Show
Feature 1.
High heat transfer performance
Feature 2.
Steel structure carries light load and is simple in design.
Feature 3.
Low heat loss.
Water-cooling wall pipes are set in the hearth as radiation heating surface of the boilers for direct heat exchange by radiation with the high-temperature flames. Convection pipes are set between hearth exits and end heating surface as convection radiation heating surface of the boilers for direct heat exchange by radiation with the high-temperature smoke. Water-cooling wall pipes and convection pipes bundle, as key heating surface of water-pipe boilers, are generally made of φ51~60mm boiler steel pipes or designed according to demand of the users.
About Hengtao Group.
We are one of the manufacturers of boiler and boiler parts in China. We have a team of engineers who have more than 20 years experience in designing, manufacturing, engineering, supplying of boiler and its spare parts. We manufacture CFB boiler, enameled corrugated plate, enameled tubular air preheater, rotary air preheater, H-finned tube economizer, spiral finned tube economizer, membrane water wall, header and other customized boiler parts.
Our Service
EPC Service
We have the EPC qualification for electric power engineering.
R & D Center
We have an engineering team who have 20 years experience in researching, designing and manufacturing of boiler and boiler parts.
Customer Service
Your satisfaction is our utmost goal!
Strength and Support
Installation Instruction
Engineers are at the construction site.
Welding Processing
Workers are welding the products.
Maintenance Service
Our workers are working at the site.

Scale: 101 - 200 People
Country/Region: China (Mainland)/Asia
Established:
USD 1500-2500 / Ton 1 Ton (Min.Order)
USD 1500-2500 / Ton 1 Ton (Min.Order)
USD 1500-2500 / Ton 1 Ton (Min.Order)
USD 1500-2500 / Ton 1 Ton (Min.Order)
USD 1500-2500 / Ton 1 Ton (Min.Order)